I can't help typing that title without 'The Final Countdown" by Europe creeping into my head. Buts its true – we got electrical sign off a couple of weeks ago, and just got final sign off from the CRD building inspector. A tour round the outside and a look at the fixtures and fittings inside and in the crawl space and we were good to go. Just need to wait for the final paperwork and then the permit is closed, the cottage is official and we can added it to our insurance, which is always good.
Still got some touching up and painting to do, and tools to move out and cleaning up to do and furnature to move in, but its a huge relief after nearly two years to know that its job done as far as inspections etc. are concerned.
The top picture in this post is the original design, and the bottom pic is a recent photo. I think we did OK at building to plan – just need to paint the outside (which can wait until its warm and dry) and we should have a match!
Watch this space for some pictures of the inside as we get tidied up and finished in there.